Home



Come Join Us in Cleveland
April 19-21, 2010


Register Now

Plant Tours
Program
Keynotes
Program Tracks

Continuous Improvement 101
Advanced Continuous Improvement
Workforce Development
Supply Chain Strategies

Networking
Accommodations
Be A Sponsor
Sponsors
Exhibitors



Advisory Board
Contact Us



Sign Up For The IW Best Plants Conference Connection Digital Magazine!

Download Dec 2009 Issue
Download Jan 2010 Issue
Download Feb 2010 Issue


2008 Highlights
2007 Highlights
2006 Highlights
2005 Highlights

About IW Best Plants






The Lincoln Electric Company – Machine Division

Location: Euclid, Ohio
Number of Tours: 2

Date: Monday, April 19, 2010
Gather in plant tour departure room: 8:15am
Departure time from convention center: 8:30am
Tour: 9:00am-11:00am
Approximate arrival time back to Cleveland Renaissance Hotel: 11:30am

Date: Monday, April 19, 2010
Gather in plant tour departure room: 12:15pm
Departure time from convention center: 12:30pm
Tour: 1:00pm-3:00pm
Approximate arrival time back to Cleveland Renaissance Hotel: 3:30pm

About The Plant

Lincoln Electric is the world leader in the design, development and manufacture of arc welding products, robotic arc welding systems, plasma and oxyfuel cutting equipment and has a leading global position in the brazing and soldering alloys market. Headquartered in Cleveland, Ohio, Lincoln has 38 manufacturing locations, including operations and joint ventures in 18 countries and a worldwide network of distributors and sales offices covering more than 160 countries.

What You Will See on the Tour

Founded in Cleveland in 1895, Lincoln Electric is in its 115th year of business. Tours will be conducted in the 800,000 square foot Machine Division. Visitors will see the assembly of the company’s various inverter, transformer, and engine driven welding machines. Lincoln has a history of vertical integration, making many of the parts used in these welders. As such, the tour will also view the sheetmetal fabrication, plastic molding, painting and coil winding areas. Six Sigma and lean tools are used for continuous improvement. Examples of techniques such as quick die changes and the move from long assembly lines to more agile short lines and assembly cells will be shown. There will be discussions on the operation's change from a forecast-and-build philosophy to a pull replenishment environment as well as the long standing and widely studied Incentive Management Program.

Please Note:
  • No open-toed shoes are permitted.
  • Safety glasses with side shields are required and will be provided.
  • Due to the amount of walking, visitors must be mobile, no crutches are permitted.
  • Cameras and all recording devices strictly prohibited.
  • Plant tour dates and times are subject to change
  • PRECLUSION STATEMENT: IW may be required to preclude attendees from taking part in certain plant tours. This step will be taken solely by IW at the request of our host plant based upon the proprietary nature of information that is to be presented. The host plants' decisions are final and will be communicated to attendees in advance. Some participants on the tour may be asked to complete a Non Disclosure Agreement (NDA).

Penton Media Logo

Copyright© 1998-2010 Penton Media, Inc. All rights reserved.
Penton Media's Privacy Policy
Technical questions or bug reports?
E-mail webmaster@industryweek.com